Skip to content
FAQ

Common questions, in plain language.

  • Why does Epoxy Flooring Ghana test substrate moisture before installation?

    Substrate moisture above ASTM F2170 thresholds compromises epoxy bond integrity within 12-18 months — invisible at handover, costly to remediate later. In-situ probe testing is empire-permanent before any Tier-1 industrial commission.

  • What load can your industrial epoxy floors handle?

    Specification-grade industrial epoxy systems Epoxy Flooring Ghana installs are rated for 10-tonne forklift point loads under sustained warehouse traffic, plus chemical exposure rated against the project's documented spillage profile.

  • What ESD compliance does your conductive epoxy meet?

    Our ESD systems meet IEC 61340-5-1 surface resistance specification (10⁶-10⁹ Ω) with full grounding network installation, conductive primer integration, and post-installation continuity testing documented per commissioning protocol.

  • What slip rating do hospital and commercial kitchen wet zones need?

    ISO 14904 R-classification: R10 dry-area minimum, R11 hospital wet zones, R12 commercial kitchens, R13 high-grease industrial. ASTM C1028 friction-coefficient testing documents slip-rating against project use class.

  • Why are integrated coved bases critical in food production?

    HACCP audit standards reject right-angle wall-floor joints because bacteria harbour in unsealed corners. Integrated epoxy coved bases eliminate the joint entirely — seamless wall-to-floor transition with no harborage point.

  • What does the written guarantee cover?

    Epoxy Flooring Ghana issues 5-year Local Performance, 7-year ISO-aligned Extended, or 10-year Industrial Performance guarantees against project classification. Terms documented in the project handover dossier — no verbal assurances, no ambiguity.

  • Can you install while operations continue?

    Yes — multi-property project office model coordinates phased installation against active facility operations. Cure-cycle planning, scheduled-shutdown windows, and zone-by-zone progression keep facility downtime to documented minimum.

  • Is the on-site survey actually free?

    Yes — every prospective Epoxy Flooring Ghana commission begins with a free on-site survey including substrate moisture verification, F-number measurement, ICRI CSP profile assessment, and chemical exposure consultation. Output: written specification brief before any commercial commitment.

  • What standards does Epoxy Flooring Ghana installation comply with?

    ISO 14644 cleanroom, IEC 61340-5-1 ESD, ASTM F2170 substrate moisture, ASTM E1155 floor flatness, ASTM C1028 friction, ISO 14904 anti-slip, HACCP food-safety, FDA food-contact compliance, ICRI CSP surface profile, ISO 9001 quality, ISO 14001 environmental, ISO 45001 occupational health & safety.

  • How long does a typical industrial epoxy commission take?

    Pharmaceutical cleanroom 2400 sqm: ~16 weeks. Logistics warehouse 5000 sqm: ~12 weeks. Hospital surgical suite 800 sqm: ~8 weeks. Decorative showroom 1200 sqm: ~6 weeks. Epoxy Flooring Ghana provides committed timeline at specification brief stage.

  • Where does Epoxy Flooring Ghana sit on price?

    Specification-grade. Epoxy Flooring Ghana is positioned for Tier-1 industrial and institutional clients where installation quality is the multi-decade investment — never the lowest-priced option, never the highest. Budget realism is documented at specification brief stage.

  • Does Epoxy Flooring Ghana take international commissions?

    Yes — operations across Ghana, Togo, and the broader francophone West African catchment via Togo representation. Diaspora clients commissioning premium installations within Ghana from Lomé, Cotonou, or Abidjan equally served.