Skip to content

West Africa Francophone

Togo & Diaspora

Epoxy Flooring Ghana project execution across Lomé, Kpalimé, Sokodé, Kara, and the broader French-speaking West African catchment — supported by Togo representation with technical leadership coordinated from Accra.

About this Office

Epoxy Flooring Ghana’s Tema presence serves one of West Africa’s most demanding industrial corridors — a zone where production continuity, chemical resistance, and slip-safe performance are not preferences but operational mandates. Established in 1981, the practice brings 45 years of specification-grade discipline to every project commissioned from this location, deploying performance-engineered systems calibrated to the precise loading, thermal, and chemical conditions of each facility.

The Tema office operates as the primary interface for clients across the Greater Accra industrial belt and the Eastern Corridor, providing on-site technical assessment, specification consultation, and project delivery at a standard that Tier-1 facility managers, procurement boards, and project engineers specify with confidence.

Sectors Served from Tema

Notable Project Patterns

From this location, the practice has delivered specification-grade floor systems across pharmaceutical manufacturing facilities within the Tema Industrial Area, cold-storage warehouses serving multinational distribution networks, and large-format logistics hubs requiring phased installation to protect ongoing operations. Decorative commissions have included premium hotel lobbies along the Tema Coastline and corporate interior fit-outs in Airport City — each project sequenced and cured to schedule, with zero tolerance for remedial works on handover.

Working Hours and Contact

Epoxy Flooring Ghana — Tema Office

Monday – Friday7:00 AM – 6:00 PM
Saturday8:00 AM – 2:00 PM
SundayClosed

Phone: +233 23 063 0004 Email: info@epoxyflooringghana.com

Site assessments and technical specification consultations are arranged by appointment. Clients are encouraged to contact the office in advance of programme milestones to allow adequate time for substrate evaluation and system selection — the foundation of every floor that performs without compromise.